ESI Industrial Building – Nemours

PROJECT

Construction of an industrial building (ESI) — Global Performance Public Contract (MGP) for the new IT services facility, Nemours (77)

CLIENT

DGFIP (General Directorate of Public Finances)

TYPE OF OPERATION

Construction of an industrial building (ESI) — Global Performance Public Contract (MGP) for the new IT services facility, Nemours (77)

MISSIONS

Olivier Palatre Architectes (lead architect), full architectural design and construction supervision mission (base + VISA)

BET - ROLE

Not specified

SHEDULE

In progress

BUDGET

7 000 000 € HT

FLOR AREA

3 400 m²

Safety

Robustness

Integration

DESCRIPTION

Located at the corner of Avenue John Fitzgerald Kennedy and Rue d’Egreville, this industrial building project responds to a dual challenge: housing a complete desktop publishing and IT printing operation—production, logistics, storage, and management—while integrating sensitively into an urban context marked by the presence of a heritage building designed by François Deslaugiers (1979).

The architectural design relies on a compact, orderly volume with a perimeter structure that completely frees up the interior floor plate. This logic ensures maximum flexibility for spaces that can be reconfigured to suit the company’s future operational evolutions. The two-story office building, positioned on the north elevation, houses workspaces and administrative areas, while the industrial zones are concealed behind this front volume to preserve the site’s image from the main thoroughfare.

Flow management—separating pedestrians from vehicles, establishing a one-way loop for heavy goods vehicles, and zoning internal traffic—structures the entire project around a clear and secure operational logic.

The façade treatment using ArcelorMittal Trapeza cladding engages in dialogue with the geometric rigor and modularity of the existing building without competing with it. Former parking areas along the property boundary are converted into gardens and bioswales, providing a green foreground for the façade while promoting sustainable rainwater management.

Sustainability guides the project from start to finish: bio-based materials, widespread natural daylighting, exterior sunshades, and rainwater harvesting systems contribute to a restrained, high-performance, and enduring architectural design.

SIMILAR PROJECTS

Urban Valley – Argenteuil

Urban Valley – Argenteuil

Mantes-la-Jolie Gendarmerie Station & 60 Housing Units

Mantes-la-Jolie Gendarmerie Station & 60 Housing Units

Logistics Building – Toledo (Spain)

Logistics Building – Toledo (Spain)

Logistics Building – Laupen (Switzerland)

Logistics Building – Laupen (Switzerland)

No results found.