Uncategorized

Municipal Technical Center

PROJET

MAÎTRE D’OUVRAGE

NATURE DE L’OPÉRATION

MISSIONS

BET

DATE

MONTANT DES TRAVAUX

SURFACES

No Results Found.

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

DESCRIPTION

MUNICIPAL TECHNICAL CENTER

MUNICIPAL TECHNICAL CENTER

wood frame
wind turbine
green roof

The CTM project is composed of two buildings: the first, facing south, is the public reception and administration building, the other includes workshops receiving zenithal light to the south and direct light to the east and west.

Passive, the building is designed as a didactic tool, a practical guide to ecology for the city's inhabitants. The wind turbine, the retention basin, the valleys, the solar panels, the compost, the wood boiler room, the green roof, the wood siding, the double flow, the wood frame, the Canadian well: all these elements are visible to the public.

Through its performance, its geometry and its colors, the new MTA represents a sustainable and desirable development.

Contracting owner : Ville de Cesson

Date : 2010
Project management : Olivier Palatre Architectes
BET : BECET
Paysagist : CAO Perrot
Program : Technical center
Surface : 3000 m²
Budget : 2 420 000 €

PROJETS SIMILAIRES

No results found.
No results found.