Olivier Palatre Architect

CONCEPT

PROJECTS

PUBLICATIONS

MUNICIPAL TECHNICAL CENTER

MUNICIPAL TECHNICAL CENTER

wood frame
wind turbine
green roof

The CTM project is composed of two buildings: the first, facing south, is the public reception and administration building, the other includes workshops receiving zenithal light to the south and direct light to the east and west.

Passive, the building is designed as a didactic tool, a practical guide to ecology for the city’s inhabitants. The wind turbine, the retention basin, the valleys, the solar panels, the compost, the wood boiler room, the green roof, the wood siding, the double flow, the wood frame, the Canadian well: all these elements are visible to the public.

Through its performance, its geometry and its colors, the new MTA represents a sustainable and desirable development.

Contracting owner : Ville de Cesson

Date : 2010
Project management : Olivier Palatre Architectes
BET : BECET
Paysagist : CAO Perrot
Program : Technical center
Surface : 3000 m²
Budget : 2 420 000 €

OTHER PROJECTS

Etoile voltaire

Etoile voltaire

China in the mirror of Islam

China in the mirror of Islam

Max Jacob

Max Jacob

65-unit housing complex

65-unit housing complex

Quai Deschamps

Quai Deschamps

Merovingian times

Merovingian times

Pollyonnay House

Pollyonnay House

Monceau apartment

Monceau apartment