Olivier Palatre Architect

CONCEPT

PROJECTS

PUBLICATIONS

3D

A BIM design with 3D films to validate the technical and architectural choices while being a support for dialogue and decision support with our clients.

Within our agency, we master this technicality which allows us in the design phase to master our architecture and to exchange positively with the design offices.

The DCE file integrates this architectural and technical pre-synthesis, an economic gain and a strong added value for the good realization of the building site, in a limited time and without additional cost.

A FEW PROJECTS

Calonne educational group

Calonne educational group

Josephine

Josephine

Les Ulis cinema

Les Ulis cinema

« Les Petits Chaperons Rouges » daycare

« Les Petits Chaperons Rouges » daycare

15 housings

15 housings

“Level 256” Platform

“Level 256” Platform

Goutte d’Or library

Goutte d’Or library

Majestic Cinema

Majestic Cinema